About Groen Gas Goor B.V.

In December 2016, Ellomay purchased 51% of the shares of Groen Gas Goor B.V., an anaerobic digestion (AD) plant, with a green gas production capacity of approximately 375 Nm3/h, and the land on which the plant is constructed. The plant in Goor began commercial operations in November 2017. The remaining 49% of Groen Gas Goor B.V. are held by a subsidiary of Ludan Engineering Ltd. according to the strategic agreement signed in connection with Waste-to-Energy projects in the Netherlands with them. The project receives a valid Sustainable Energy Production Incentive subsidy from the Dutch authorities for the energy it generates for a period of approximately twelve years.

A project finance loan has been signed for this project with a leading bank in the Netherlands.

Location

Goor, the Netherlands